High-voltage Electrical Equipment Operation Standards
Pre-operation Preparation
-
Safety Confirmation
- Check equipment nameplate parameters
- Confirm operation authorization
- Prepare specialized insulation tools
-
Environment Inspection
- Ensure work area is dry
- Remove surrounding conductive objects
- Set up multiple safety warnings
Operation Procedures
- Power-off operation steps
- Voltage detection confirmation procedure
- Grounding wire connection method
Safety Precautions
- Strictly prohibit single-person operation of high-voltage equipment
- Follow the "power-off - voltage detection - ground wire connection" sequence
- Check equipment status after operation